Ramp and overpass for crossing a glue bridge
Ramp and overpass section that carries operators and material across a glue bridge without interrupting the line. Integrates into new or existing production lines.
Sample materials are recommended to properly set the machine up, allowing for correct binder sizing, precise timing adjustments and thorough performance testing.